Storehouses and buildings
Family houses
All-in contract houses can be built within 3 months. The construction is not dependent on weather. Due to a small amount of used materials, small space for storage is needed.
Light masonry buildings
Light masonry buildings are characterized by speed of construction, high layout variability and low price.
Prefab buildings
Prefab buildings meet even the most demanding building construction criteria. The skeleton of a prefab building is composed of a steel frame with a span of up to 7.2 meters.
Steel buildings
Buildings with a steel frame are intended for construction in the area of industrial production, storage, business and agriculture.