Thermal separation of balconies in existing buildings

Thermal separation of balconies in existing buildings

Solutions and concepts from Schöck for existing building stock

The value of older buildings is enhanced by upgrading thermal insulation over large areas, but the effect of thermal bridging where the balcony connects must be minimised. It is Schöck’s ability to meet different construction requirements, that makes it possible to guarantee the same high standard for balcony renovation work in existing building stock as was previously only possible for new buildings.

The result is a combination of architectural design freedom, optimum thermal separation of the construction elements, and full load transfer, if the building has the necessary structural requirements. Unlike new-build, product selection for renovation is subject to certain restrictions and the solution will very much depend on the specific project requirements and the development of customised design proposals.


Are you interested in this product? Contact us using form below or contact us directly on e-mail info@mrs.cz or call +420 545 175 844 or +420 602 707 001.

Ask a question about this product

Columns marked by * are required.

Kód